Please confirm you are human

This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.

A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.

Hold with a pointer, or hold Space or Enter.

News

Evanston RoundTable
evanstonroundtable.com > 08/17/2026 > city-to-start-levy-center-kitchen-renovations-in-late-august-construction-to-last-through-mid-october

City to start Levy Center Kitchen renovations in late August, construction to last through mid-October

8+ hour, 41+ min ago   (175+ words) The City of Evanston will begin renovations on the Levy Senior Center kitchen in late August, with construction expected to continue through late October. The kitchen, which has not been renovated since the building opened in 2001, was originally designed primarily…...

Evanston RoundTable
evanstonroundtable.com > 02/09/2026 > eths-solar-panel-savings

ETHS exploring budget-neutral solar panel installation

6+ mon, 1+ week ago   (658+ words) A Honeywell representative visited Monday night’s Evanston Township High School Board of Education meeting to share preliminary estimates on the money the school could potentially save by installing solar panels. The figures provided, though not yet final, indicate that ETHS…...